Email us: mianakram.engineering786@gmail.com
Office hours: 08:00 am – 07:00 pm
General Engineering Works Β· Est. 1992
Gradual cooling, stage by stage. Every gum piece stays stable.
Model GES02_MN168_225
The GES02_MN168_225 is built for advanced, gradual cooling of bubble gum, bazooka gum and confectionery products, with automatic air recycling for precise temperature control across nine cooling stages.
Specifications
Full technical details of the Nine Step Cooling Tunnel with 10 Ton AC unit.
Capacity & Cooling
Step-by-step cooling prevents surface cracks, maintains shape accuracy and improves final texture and finish.
Function & Application
The Nine Step Cooling Tunnel by GEW is designed for bubble gum, bazooka gum and confectionery products. Its nine-floor conveyor and 10 Ton low temperature AC with automatic air recycling give superior product stability before packaging.
About This Machine
The Nine Step Cooling Tunnel by GEW is designed for advanced, gradual cooling of bubble gum, bazooka gum and confectionery products. Featuring a 10 Ton low temperature air conditioning system with automatic air recycling, it delivers precise temperature control across nine cooling stages. Built with a high-grade food-safe structure, it offers hygiene, durability and seamless integration into complete production lines.
General Engineering Works Β· Est. 1992
Control & Safety
The tunnel is totally covered, with a double door control panel that houses the inverters and protection system, plus an emergency stop for safe operation.
Applications
For lines where consistent product temperature before packaging is essential.
Contact our engineering team for a quote, technical details or delivery information.
